翻訳と辞書
Words near each other
・ Chandrani Pearls
・ Chandranilekkoru Vazhi
・ Chandranudikkunna Dikhil
・ Chandrapal Singh Yadav
・ Chandrapore
・ Chandraprabha
・ Chandraprabha Aitwal
・ Chandraprabha Vidyapitha, Paksey
・ Chandraprakash Dwivedi
・ Chandrapratap Singh
・ Chandraprava Saikiani
・ Chandrapur
・ Chandrapur (Lok Sabha constituency)
・ Chandrapur (Vidhan Sabha constituency)
・ Chandrapur Airport
Chandrapur back to back HVDC converter station
・ Chandrapur Bagicha
・ Chandrapur College
・ Chandrapur district
・ Chandrapur ferro alloy plant
・ Chandrapur Municipal Corporation
・ Chandrapur Municipality
・ Chandrapur Super Thermal Power Station
・ Chandrapur, Guwahati
・ Chandrapur, West Bengal
・ Chandrapura
・ Chandrapura railway station
・ Chandrapura Thermal Power Station
・ Chandrapura, Buxar, Bihar
・ Chandrapuram


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Chandrapur back to back HVDC converter station : ウィキペディア英語版
Chandrapur back to back HVDC converter station

The Chandrapur back to back HVDC station is a back to back HVDC connection between the western and southern regions in India, located close to the city of Chandrapur. Its main purpose is to export power from the Chandrapur Super Thermal Power Station to the southern region of the Indian national power grid.
The Chandrapur back to back HVDC station is owned by Power Grid Corporation of India.
The converter station consists of two independent poles, each with a nominal power transmission rating of 500 MW. Both poles were built by GEC-Alstom between 1993 and 1997〔Prasher V.K, Kumar Devender, Gupta R.S., Suri Rajesh, Joshi Ashok, Mukoo Sanjay, (Operational Experiences of Chandrapur 2 x 500 MW back to back station ), CIGRÉ session, Paris, 2002, paper reference 14-121.〕 and have nominal DC voltage and current ratings of 205 kV, 2475 A.
The converter station is located from the eastern terminal of the Chandrapur–Padghe HVDC transmission system. The close proximity of the two converter stations meant that the control systems needed to be carefully coordinated, a task made more challenging by the fact that the two stations were built by different manufacturers. To address this problem a series of joint simulation studies, involving the control equipment from both converter stations connected to a common simulator, was performed.〔Abbott, K.M., Aten, M., (Two HVDC schemes in close proximity: a coordination study ), CIGRÉ Session, Paris, 2000, paper reference 14-109.〕
On 31 December 2013, the Northern, Eastern and Western grids were synchronised with the Southern regional grid, creating a single synchronous AC grid over the whole of India. 〔(One Nation – One Grid ), Powergrid website (retrieved 18 November 2015). 〕 As a result the converter station is no longer required for its original purpose of asynchronously linking the Western and Southern grids, although it can still be used as an embedded power flow device to help control power flow within the AC system. The stations could potentially be shifted to elsewhere to export/import power from other countries. Sometimes the excess power fed to the southern grid by this HVDC link is flowing back to Western region through the 765 KV AC lines between Southern grid and the Western grid with futility.
== Arrangement and main equipment ==


抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Chandrapur back to back HVDC converter station」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.